Just talked to Robert and he's going to make a cross draw for the Seecamp. I had him make it with the retention strap, as is, on Dan's; fully lined, with full stitching, black; ten to twelve week lead time.
I had to wait for a train at a railroad crossing, in the middle of nowhere, the other day, and thought I better pull the Seecamp out of my pocket for safety reasons; couldn't get it out of the pocket.
I think this will solve that situation.